C11 Chemnitz - Stollberg

Line properties

Length: 23.1 kilometres, of which

  6.8 kilometres (Chemnitz Hbf. - Chemnitz-Altchemnitz, 2-track tram line of the CVAG) and
16.3 kilometres (Chemnitz-Altchemnitz - Stollberg, single-track branch line, leased from DB and operated by CBC)

Speed:

Vmax = 60 km/h between Chemnitz Hbf. and Chemnitz-Altchemnitz (BO-Strab) and
Vmax = 80 km/h between Chemnitz-Altchemnitz and Stollberg (EBO)

Travel time and speed, driving programme:

Chemnitz main station - Stollberg in 49 minutes (28.3 km/h)
33 train pairs on weekdays (except Saturday)
25 pairs of trains on Saturdays
19 pairs of trains on Sundays and public holidays

Start of operation by City-Bahn Chemnitz GmbH: 

15 December 2002

Vehicles used:

Regio-Variobahnen NGT6-LDZ (Monday to Saturday four vehicles, on Sundays and public holidays two vehicles)
Linienführung C11 Chemnitz - Stollberg
Line C11 Chemnitz - Stollberg

Other lines